Company Capability
Project Management
- We offer full management and planning services
- Structural engineering
- Primavera planning
- CAD Drafting
Workshop Infrastructure
- Undercover workshop (70m x 14m & 50m x 22m) complete with 2 x 5t overhead cranes
- Open work area (100m x 80m) fully serviced
- Plate roller capacity 3.6m wide x 20mm thick (2.0 wide x 40mm thick)
- Plate roller capacity 3m wide x 12mm thick
- Plate roller capacity 2m wide x 10mm thick
- Section rolls capacity 125 x 125 x12 each
- Vertical press – capacity 350t
- Break press - capacity 150t
- Guillotine - capacity 3.0m wide x 12mm thick
- Band saw - capacity 360 wide material
- NC profile cutting machine
- Plasma cutting up to 25mm thick stainless steel
- Automatic welding machines
- Milling machine – horizontal
- Milling machine – vertical
- Lathe (8m bed & 3m bed)
- Radial drills x 3
- Slotter machine
- Surface grinder
Site Infrastructure
- 40t Crane (Coles rough terrain)
- 25t Crane (Grove Rough terrain)
- 10t Crane x 2
- 8t Crane
- 6t Crane
- 45 Foot elevated work platform
- 6t Forklift
- Diesel welding machine
- Rigging equipment (20t chain blocks, beam trolley and beam clamps)
- Jacking equipment (up to 150t jacking)
- Portable plasma
- On site office and crib room facilities
- Fully fitted service containers
- Scaffolding (quick stage, tubular and aluminum)
- Tripod support systems
Site Installation Labour
- DLI Welders (TIG Expertise)
- Boilermakers
- Fitters
- Scaffolders
- Riggers
- Crane Drivers
Transportation
- Prime Mover and assorted trailers
- 4off 12 seater buses for mobilisation of site personnel
- 2off flat bed trucks